|
|
| |
- SECON has executed over 400,000 Hectares of Irrigation Projects
- We possess more than 15 years of experience in Irrigation Projects
- Presently we are executing the World Bank Aided U.P.Irrigation Water Restructuring Project -Scope covers over 600,000 Hectares
|
| Scope Of Services |
| Irrigation |
-
Macro level first hand survey, planning and investigation for catchment area, hydrogeology, capacity survey and sedimentation analysis
-
Optimisation of submergence area, dam axis and command area
-
Micro level survey, planning and investigation for reservoir limit, dam axis site and main canal alignment
-
Survey, planning and design of main canal and distribution network with minimum cut, fill and length, covering maximum command area
- Location of structures, full supply level and cut-off statement
- Field to field survey, fixing of canal network, chak limits, alignments and lateral survey
- Planning of minor, sub-minor, field channels and collector drains, Sourcing of materials, quarry and lead statement
- Design of structures for dam, barrage, cyclone protection bunds, spill ways, head works, aqueduct, via duct, cross drainage works, road over canals, structures, culverts, super passages and out-lets
- Setting out and staking of alignment, apex points, etc.
- Earthwork calculations, rate analysis and bill of quantities
- Land width calculation and rehabilitation of sub-merged area
- Generation of comprehensive GIS/MIS database for engineering and land management, preparation of detailed project report
|
|
| Flood Control |
- Hydraulic model study, 3D terrain modeling, flood control and protection measures
- Underwater leak detection of dams, shafts, tunnel and arresting leakage with turnkey solutions
|
| Water Management |
- Comprehensive water management schemes for river basins, linking of rivers, soil erosion and rotation of crops, depending on climatic condition and water availability
- Lift irrigation schemes for water distribution
|
| Survey, Planning and Design of Brackish Water Shrimp Farms |
- Survey and investigation, testing for physical and chemical properties
- Design of cyclone protection bunds, intake channel, out-falls, pond layout, related structures, internal road, power and water supply
- Rate analysis, BOQ and detailed project report
|
|
|